Tuy Ha 110/22kv transformer substation extension Project
IDICO –UDICO is the Company that takes in charge of managing Tuy Ha 110/22KV substation with total area of 2700ha supplying electricity to Nhon Trach industrial zones 1, 2, 3, 5 and Loc Khang Industrial zone.
.In order to meet demand of additional charge of the factories located in the industrial zones, IDICO – UDICO had plan to install 2 63MVA transformers more for the period between 2005 and 2010. So far 1 63MVA has been installed and brought into operation.

Capacity of the substation: The total capacity of the substation after the installation of 63MVA transformer: 2x63 + 1x40 + 1x16MVA = 182MVA. At present IDICO – UDICO has project to extend the existing substation and after completed, the substation will ensure the stable electricity source for investors in the Nhon Trach industrial zones. |